A documented sequence from an installed screw layout, through membrane preparation, to a timber base frame supported over visible screw heads.
Evidence recordInstalled layout through timber-base stage
FoundationGround screw heads visible across the footprint
StructureTimber base frame
Site contextEnclosed garden with close boundaries
PROJECT CONTEXT
This record follows the installation from the prepared screw layout through membrane preparation and timber-base framing.
PROJECT EVIDENCE
Installation on site
Four short, silent clips showing screw installation, installed positions and the prepared garden footprint.
Positioning the first screwThe installation team aligns the drive head over a marked garden-base position.Driving the screwA ground screw is driven vertically into the prepared footprint.Installed positionsThe marked layout with ground screws installed ready for the next foundation stage.Prepared footprintThe completed screw positions remain accessible through the fitted ground membrane.